Product Details
Place of Origin: Henan, China
Brand Name: Zhenglan Cable
Certification: 3C,ISO 9001:2015,ISO 14001:2005
Model Number: Bare aluminum alloy conductor 1165MCM 590mm2(61/3.51mm) ASTM B399/399M
Payment & Shipping Terms
Minimum Order Quantity: 3000kgs
Price: Negotiable
Packaging Details: Fully wooden drum, steel wooden drum, fully steel drum or customized
Delivery Time: 15-30 days
Payment Terms: L/C, T/T,, Western Union
Supply Ability: 20,000 ton/year
Commodity Item: |
1165MCM |
Size: |
590mm2 |
Number Of Conductors: |
1 |
Conductor Material: |
Bare Aluminum Alloy |
Structure: |
61/3.51mm |
Conductivity: |
52.5% IACS |
Commodity Item: |
1165MCM |
Size: |
590mm2 |
Number Of Conductors: |
1 |
Conductor Material: |
Bare Aluminum Alloy |
Structure: |
61/3.51mm |
Conductivity: |
52.5% IACS |
AAAC conductor are made of 6201-T81 aluminum alloy, conforming to ASTM Specification B-399. They are suitable for use in spans on wood poles, transmission towers, and other structures where AAC conductors do not provide the required strength and ACSR conductors are not required or suitable.
Code Name | Total Area | Stranding | Conductor | Conductor Weight | Rated Strength | Max DC resistance | |
diameter | at 20 oC | ||||||
AWG or MCM | mm2 | No / mm | mm | kg/km | kN | Ω /km | |
/ | 1165.1 | 590 | 61x3.51 | 31.59 | 1620 | 167 | 0.05675 |
Why you choose us?
RFQ:
1. Is your company a factory or a trade company?
Factory, more than 20 years in China
2. How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
3. What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
4. What’s the delivery time?
Sample order needs 3~5 days.
Formal order depends on the quantity, usually it needs 15 working days after get your payment.
5. What is your MOQ?
Generally it is 5000m.