Product Details
Place of Origin: Henan, China
Brand Name: Zhenglan cable
Certification: 3C,ISO 9001:2015,ISO 14001:2005
Model Number: 0.6/1kv 12x2.5mm2 control cable CU/PVC/CTS/PVC IEC60502-1
Payment & Shipping Terms
Minimum Order Quantity: 2000m
Price: Negotiable
Packaging Details: Rolls or Customerised
Delivery Time: 15 Working Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 82,000 KM/Year
Name: |
0.6/1kv 12x2.5mm2 Control Cable CU/PVC/CTS/PVC IEC60502-1 |
Conductor: |
Bare Copper |
Insulation: |
Pvc |
Sheath: |
Pvc |
Outer Sheath Colour: |
Black |
Core: |
12 |
Shield: |
Copper Tape |
Name: |
0.6/1kv 12x2.5mm2 Control Cable CU/PVC/CTS/PVC IEC60502-1 |
Conductor: |
Bare Copper |
Insulation: |
Pvc |
Sheath: |
Pvc |
Outer Sheath Colour: |
Black |
Core: |
12 |
Shield: |
Copper Tape |
Application
For supervisory electrical equipment, station control circuits. Suitable for indoor and outdoor installation in wet or dry locations, in conduit, duct, trench and cable tray. With metallic armour, the cable is suitable for installation in areas where special mechanical protection is required.
Cable Construction
Conductor
Concentric stranded annealed copper
Optional : Flexible or solid annealed copper
Insulation
PVC (Polyvinyl Chloride)
Screen
Copper tape
Sheath
PVC (Polyvinyl Chloride)
Technical Data Sheet
Why choose us:
RFQ:
1. Is your company a factory or a trade company?
Factory, more than 20 years in China
2. How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
3. What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
4. What’s the delivery time?
Sample order needs 3~5 days.
Formal order depends on the quantity, usually it needs 15 working days after get your payment.