Product Details
Place of Origin: Henan, China
Brand Name: Zhenglan Cable
Certification: ISO 9001:2015,ISO 14001:2005; CCC
Model Number: 1/0 AWG POLY / ALUMINIUM QUADRUPLEX CABLE, 19 STRANDS ICEA S-76-474
Payment & Shipping Terms
Minimum Order Quantity: 1000m
Price: Negotiable
Packaging Details: Wooden drum, iron wooden drum or as required
Delivery Time: 10 days
Payment Terms: L/C, T/T
Supply Ability: 15,000 KM/Year
Insulation Material: |
XLPE |
Cable Conductor: |
Aluminum |
Standard: |
ICEA S-66-524 (NEMA WC7) |
Structure: |
AAC/XLPE |
Voltage: |
0.6/1KV |
Port: |
Qingdao Or Shanghai |
Insulation Material: |
XLPE |
Cable Conductor: |
Aluminum |
Standard: |
ICEA S-66-524 (NEMA WC7) |
Structure: |
AAC/XLPE |
Voltage: |
0.6/1KV |
Port: |
Qingdao Or Shanghai |
1/0 AWG POLY / ALUMINIUM QUADRUPLEX CABLE, 19 STRANDS ICEA S-76-474
Application
To supply 120 volt aerial service for temporary service at construction sites, outdoor or street lighting. For service at 600 volts or lower at a conductor temperature of 75°C maximum.
Applicable Standard
ASTM B 230
ASTM B 231
ASTM B 232
ASTM B 233
ICEA S-66-524 (NEMA WC7)
Construction
Concentric strand or compressed 1350-H19 conductor, polyethylene or cross-linked polyethylene insulation, concentric strand AAC, ACSR, or 6201 alloy neutral messenger.
Technical Data
Products images:
Why Choose Zhenglan Cable:
FAQ
Is your company a factory or a trade company?
Factory, more than 20 years in China
How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity. Usually it needs 7-30 days after get your payment.
What is your MOQ?
Generally it is 5000m.